Implementation of XML format for depository reports is divided into stages. NSD notifies clients about each implementation stage in advance, publishing specifications that include XML schemas and general message examples based on industrial anonymized copies. Draft specifications are published in the Releases section 1–2 months before stage release, and the final version — in the EDI Documents section in Specifications of functional electronic documents of NSD EDS 10 days before release. It is recommended to use XML schemas as the main reference when implementing new formats.
Within each translation stage, the following is carried out:
Parallelly with report translation during 2025, the following is planned:
For all reports, a period of parallel operation of XML and DBF formats is planned. End of parallel report operation and disconnection of DBF format delivery is planned for the first half of 2027 for all translated reports. Terms of translating depository reporting to XML and stage content may be adjusted. Terms of ending parallel operation and disconnecting SWIFT format may be adjusted.